• [email protected]
  • 1-(888) 237-4743
Contact Us
logo
  • Home
  • About Us
  • Services
    • Generation Interconnection
    • Transmission System Planning Studies
    • Transmission System Operation Studies
    • Electromagnetic Transient Studies
    • Power System Modelling
    • Substation Design and Engineering
    • Power System Study Automation Tool Development
  • Projects
    • Generation Interconnection USA
    • Generation Interconnection Canada
    • Transmission System Planning and Operation Studies
    • Electromagnetic Transient Studies
  • Clients
  • Careers
  • Contact Us

GENERATION INTERCONNECTION PROJECTS IN THE UNITED STATES

Midcontinent Independent System Operator (MISO)
  • Prepared transmission system base case models and generator data
  • Dispatch Study projects and all higher queued projects utilizing MISO Fuel Type Dispatch methodology.
  • Perform power flow analysis to identify thermal constraints that meets MISO constraints criteria.
  • Prepare mitigation plan in coordination with MISO and impacted Transmission Owner. Calculate and provide cost allocation (if any) for the study projects.
  • Perform voltage analysis to identify voltage constraints that meets MISO constraints criteria. Prepare mitigation plan in coordination with MISO and impacted Transmission Owner. Calculate and provide cost allocation (if any) for the study projects.
  • Prepared System Impact Study Report
MISO Affected System Study-PJM AF2 queue

MISO Affected System Study-PJM AF2 queue


PJM Interconnection
  • Prepared dynamic models for interconnection projects, and performed generator dynamic impact studies.
  • Involved with more than 200 generator interconnection projects from a variety of generation sources, including natural gas, wind/offshore wind, solar and energy storage projects. The scale of these projects ranged from 20 MW to 1681 MW.
Portfolio Highlights

432 MW offshore wind project

176 MW wind project

20 MW storage project

95 MW solar project

700 MW natural gas project


New York Independent System Operator (NYISO)
  • Performed Steady State Analysis (N-0 & N-1), Steady State Analysis (N-1-1), Stability Analysis, Transfer Assessment, Short Circuit Analysis and NPCC A-10 Testing.
  • Prepared feasibility and system reliability impact study reports for interconnection projects.
Portfolio Highlights

Rolling Upland Wind Project Feasibility Study

Rolling Upland Wind Project System Reliability Impact Study

Turkey Hollow Solar Project System Reliability Impact Study

Bluestone Wind – System Reliability Impact Study

Darby Solar Project Small Generation System Impact Study

Daybreak Solar Project Feasibility Study

High Bridge Wind LLC - Wind Project System Reliability Impact Study

Bluestone Battery System Reliability Impact Study

Magruder Solar System Reliability Impact Study

High Bridge Battery System Reliability Impact Study

Levy Grid System Reliability Impact Study

Pirates Island System Reliability Impact Study


Southwest Power Pool (SPP)
  • Prepared transmission system base case models and generator data
  • Performed Stability Analysis, Short Circuit Analysis and Power factor analysis calculations
  • Prepared the Definitive Interconnection System Impact Study Report